LinkChecker icon

LinkChecker

Check your content for broken links

LinkChecker icon

LinkChecker

Check your content for broken links

Screenshots

  • Detailed reporting with support for downloading everything in spreadsheet format

This app adds a widget to Content Studio. The widget lets you check all your content for broken links in the rich text editor, both internal, and external (URLs)

Releases

  1. 3.2.0

    • Added path to results in the widget view
    • Added more principals and roles
    • Updated dependencies
    • Compatibility:

      • 7.9.2
  2. 3.1.0

    • Possible to choose to check master brach
    • Added HTTP status messages to result (including report)
    • Added information about how the cache works in the "Tips and information" box
    • Can start linkChecker again without refreshing browser if we get error from websocket
    • Compatibility:

      • 7.9.0
  3. 3.0.1

    • Fixed bug with internal links always being listed twice.
    • Fixed bug with valid external links being listed as "Need manual review".
    • Compatibility:

      • 7.9.0
  4. 3.0.0

    • Possible to use with Content Security Policy (CSP) from Enonic XP version 7.9.0
    • Localization added, so it now supports Norwegian and English.
    • Compatibility:

      • 7.9.0
  5. 2.0.1

    • Upgraded to XP7
    • Compatibility:

      • 7.2.0
  6. 1.0.0

    • Initial release
    • Compatibility:

      • 6.12.0